AGP Picks
View all

Highway 14 culvert replacement project completed (Oct. 9, 2026)

News originally published by

Minnesota Department of Transportation

Latest news releases

WILLMAR, Minn. – The Minnesota Department of Transportation announces the completion of the Highway 14 culvert replacement project west of Lake Benton.  Work began on Aug. 10 and included the replacement of three box culverts located about two miles east of the Minnesota/South Dakota line.

The project improves drainage, extends the life of the roadway infrastructure, and provides a smoother, safer driving surface for motorists.  The detour will be removed by the end of the day and normal traffic can resume.

Midwest Contracting was the contractor for this $2.02 million project.

Stay connected

Learn about the project at Highway 14 Culvert Replacements - MnDOT

 

###

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

South Dakota Dispatch

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.